Foshan Sanshui Leping Nanxuan aluminum products factory
One-stop aluminum supply molding
0757-87662472
139-2321-8643
1. Use a crane to lift the preinstalled filter chamber from the preheating furnace to the disassembly and installation platform of the filter chamber to complete the hot tightening. 2, the hot tight good chamber will be suspended into the melt filter corresponding position, fixed after heat balance for 1 hour. 3. Open the Air Filter Chamber Bleed Valve and slowly turn the inlet handwheel. 4, when the pressure after the filter slightly decreased, that the filter chamber began to feed, stop turning the Handwheel, to ensure that the pressure after the filter did not change significantly. 5. When the bleed valve overflows the melt, tighten the bleed valve. 6, slowly and evenly at the same time rotating in and out of the empty handwheel, (to filter the pressure does not occur as a large fluctuation) , until the switch in place. 7, observe whether the various parts of material leakage, no abnormalities, cover the insulation board. 8, work 2 hours to ensure that the new filter room is normal, hang open to clean up the filter room vent valve, drain the residual pressure, do not face the vent valve, in case of accidents. Remove the filter chamber and disassemble while it is hot. 10. The disassembled filter element is placed in a special container and is lifted with the filter chamber body to the fluidized bed for cleaning.
Nanxuan Aluminium Products Factory, Leping town, Sanshui district, Foshan
Tel: 13923218643
Tel: 13553333163
Tel: 0757-87662472
QQ: 173046089
Mailbox: 173046089@qq. com
Wechat: 13923218643
Website: www.fsnanxuan.com
Address: Leping Industrial Park, Leping town, Sanshui district, Foshan
Foshan City Sanshui district leping town Nanxuan aluminum products factory, all rights reserved